There are two more application windows left for the Government’s Industrial Heat Recovery Support (IHRS) Programme supporting energy efficiency and industrial decarbonisation measures. 

The £18m programme has been specifically designed to encourage and support manufacturing and data centre industry investment in heat recovery technologies across England and Wales. This means helping businesses of any size to identify and invest in opportunities for recovering and reusing heat that would otherwise be wasted. 

The IHRS can support eligible industrial waste heat recovery projects from concept and definition through to implementation and operation start-up. So far, the IHRS has supported 20 projects in cutting their energy bills and reducing carbon emissions, spanning numerous sectors including Paper, Food and Drink, Chemicals, Cement and Mineral Products, Metallic Products and Steel. The final application deadlines are 31st January 2020 and 31st July 2020.

Basell’s Carrington Heat Recovery and Integration Project

LyondellBasell Industries (LBI) is one of the world’s largest polymers, petrochemicals and fuels companies. LBI is a global leader in polyolefins technology, production and marketing; a pioneer in propylene oxide and derivatives; and a significant producer of fuels and refined products, including biofuels. Through research and development, LyondellBasell develops innovative materials and technologies that deliver exceptional customer value and products that improve quality of life for people around the world.

The LyondellBasell Carrington polyolefins site, 10 miles to the south-west of Manchester has made significant strides in reduction of energy use through optimisation and small/medium projects. A feasibility study had previously been carried out into the potential of a further step-change reduction in boiler gas consumption by the installation of a heat integration scheme. The conclusion was that, although interesting, the return on such a project would be marginal and further development was on-hold until March 2019 when BasellPolyolefins put in an application to the Department for Business, Energy and Industrial Strategy’s (BEIS) Industrial Heat Recovery Support (IHRS) Programme.

The IHRS Programme is designed to encourage and support investment in heat recovery technologies. The recovered heat can be used within the industrial site, by another end user or used to generate power, helping businesses to lower their fuel costs, reduce waste heat and cut emissions. Chemicals is one of the industrial sectors eligible to participate in the Programme due to an acceptable SIC Code plus data centers.

BasellPolyolefins was awarded up to £40,680 grant funding towards preliminary engineering for their project. The project proposes utilising the heat available in two vapour recycle streams (heat source) to provide the re-boil duty of a distillation column (heat sink) resulting in savings of steam for the distillation reboiler and cooling water for the recycle condensers. 

The availability of support via the IHRS Programme unlocked internal funding to further develop the project to the Front-End Engineering (FEED) stage. A local engineering design consultancy who had carried out other project design for the company was appointed to further develop the design into a full FEED package, with support from a small team of LyondellBasell’s own engineers where appropriate.

The heat recovery was achieved by providing piping for the vapour recycle from the main production plant to the distillation unit ~150m away. Based on the pressures and compositions of the hot and cold streams, the differential temperature across the system was limited, thus resulting in a much larger reboiler being required. A separation vessel was also included in the design to allow the liquid and gas streams to be returned separately to the main production plant.

The overall energy savings of the proposal are approximately 17,000 MWh (net) of natural gas and associated reduction of approximately 3,500 tonnes of carbon dioxide emissions from the site boilers. Wider benefits achieved include a commensurate reduction in electrical energy on the cooling water tower pumps and fans and a small reduction in make-up water to the cooling tower from the nearby river.

The site energy manager, David Royle, said “The IHRS Programme made the difference to further develop the heat integration project which had been shelved for the last 2-3 years. This also created the chance to assess the opportunity in more detail and provide more information on technical and economic feasibility that may be the difference between such a project being installed or not.”

If you are interested in finding out more about the IHRS Programme, please visit the IHRS gov.uk webpage or email ihrsprogramme@icf.com to talk to BEIS’s IHRS delivery partner, ICF. 

©2020 HEELEC Ltd. Treviot House, 186-192 High Road, Ilford, Essex, IG1 1LR | Contact us | Term of use | Privacy policy

Get in touch with us

Any queries? Please send the organiser an email and we'll get back to you, asap.

Sending

Log in with your credentials

Forgot your details?